conventional formwork vs aluminium formwork

ITEMS Light Steel Formwork Playwood Formwork Plastic Formwork Aluminium Formwork
Cycle Time 20-25 Days 20-25 Days 16-20 Days 7 Days
Material Thickness 2-2.5 mm Thickness Steel Plate 12 mm, 18 mm & 20 mm thickness playwood 20 mm Thickness Plastic Sheet 4 mm Thickness Aluminium Profile
Side Frame 55 mm 12-20 mm 80 mm 65 mm
Weight Kg/m2 30-35 Kg. 10.5 to 14 Kg. 20 Kg. 21-22 Kg.
Load (Kn/m2) 30 30-20 60 60
Cost Effectiveness low low high higher
Cycle Time 50 12-14 100 200
Quality of Concrete Surface smooth surface, low accuracy rough surface smooth surface, fair smooth surface fair & sine
Aplication Wall, Column & Slab Wall, Column, Slab & Beam, Bridge & Conventiional System Wall, Column, Slab & Beam, Bridge & Conventiional System Wall, Column, Slab & Beam, Bridge & Monolithic System
Recycle Value of the Material High Low Medium High